logo
Welcome to Guangzhou Tieqi Construction Machinery Co., Ltd.

21N-26-00131 Swing Gearbox Assembly for PC1250-8 Excavator

Basic Properties
Place of Origin: China
Brand Name: IRON CAVALRY
Certification: ISO,CE
Model Number: PC1250-8
Trading Properties
Minimum Order Quantity: 1 PCS
Price: Negotiable Price
standard packaging: Wooden Case Or As Required
Delivery Time: 3-7days (depend on order)
Payment Terms: T/T,Western Union
Supply Ability: 500pcs /Month
Product Summary
Product Description Model:21N-26-00131 Swing Gearbox Category:Komatsu Equipment Parts Condition: Original & OEM Warranty:6-12 Months MOQ: 1 pcs Production Capacity: 500pcs /Month Standard or Nonstandard: Standard Payment Term: L/C,T/T, Western Union, Tradeassurance Delivery Time: 3-7days (depend on ...

Product Details

Highlight:

PC1250-8 swing gearbox assembly

,

21N-26-00131 swing gearbox

,

Komatsu excavator swing gearbox

Application Industries: Mining / Construction / Equipment Repair / Plant Hire
Part Number: 21N-26-00131
Condition: New / Rebuilt
Packaging: Carton / Wooden Box
Product Name: PC1250-8 21N-26-00131 Swing Gearbox
Warranty: 6-12 Months
Product Type: Komatsu Equipment Parts
Fitment Verification: 100% Match Based On Machine Part Number
Product Description

Product Description
Model:21N-26-00131 Swing Gearbox Category:Komatsu Equipment Parts
Condition: Original & OEM Warranty:6-12 Months
MOQ: 1 pcs Production Capacity: 500pcs /Month
Standard or Nonstandard: Standard Payment Term: L/C,T/T, Western Union, Tradeassurance
Delivery Time: 3-7days (depend on order) Means of Transport: By Sea, Air or DHL/FEDEX/TNT/EMS

Our Capabilities
  • Over 500 assembly types in stock, with access to more than 6,000 different parts.

  • Core products include hydraulic pumps, control valves, travel assemblies, and swing assemblies.

  • Specialized in components for large mining excavators and hard-to-find parts.

  • A 4,000 m² factory supporting professional manufacturing, precision assembly, and rigorous testing.

  • An integrated supply chain delivering cost-effective, convenient one-stop solutions.

21N-26-00131 Swing Gearbox Assembly for PC1250-8 Excavator

Your Reliable Partner for Hydraulic Parts

  • Simplify purchasing with a single source for your hydraulic requirements.

  • Get the quality you need at a competitive price.

  • Enjoy personalized service from a team that values your business.

  • Access extensive stock, prompt delivery, and extended warranty options.

  • Find the right excavator parts with knowledgeable support and precise part number information.

  • Source parts for diverse equipment needs through our broad supply network.

21N-26-00131 Swing Gearbox Assembly for PC1250-8 Excavator

Customer Feedback
These are messages from customers after installation and testing. They shared updates from the job site, confirmed that the equipment was working properly and told us how they felt about the parts and service.
21N-26-00131 Swing Gearbox Assembly for PC1250-8 Excavator
Packaging & Delivery

From cushioned wooden crates to securely wrapped pallets, our packaging helps reduce the risk of transit damage. You can focus on your equipment needs while we take care of preparing your parts for shipment.

21N-26-00131 Swing Gearbox Assembly for PC1250-8 Excavator

Purchase Process

  1. Confirm Your Requirements: Check your machine model, serial number, and part number.

  2. Send Your Inquiry: Contact us with your requirements or a detailed RFQ.

  3. Receive Our Quotation: Get competitive pricing, availability, and a delivery plan.

  4. Confirm Your Order: Review the order details and confirm your purchase.

  5. Fast & Secure Shipping: We ship your order safely and keep you informed throughout delivery.

FAQ Section

  • Q1: Can a swing gearbox problem cause uneven rotation in different directions?

    Yes. Uneven rotation may be related to internal gear wear, bearing damage, or other problems in the swing drive system. Check both rotation directions and inspect the gearbox before identifying the cause.

  • Q2: What should be inspected if metal particles are found in the swing gearbox oil?

    Check the gears, bearings, and internal contact surfaces for abnormal wear or damage. Also inspect the oil condition and identify the source of contamination before refilling.

  • Q3: How can gear backlash affect swing gearbox operation?

    Excessive backlash may cause impact noise, increased movement between gear teeth, and unstable power transmission. Backlash should be measured against the specifications in the PC1250-8 service manual.

For detailed specifications, pricing information, or technical consultation, please contact our sales team for personalized assistance.

Related Products
  • Construction E320C Excavator Used Hydraulic Pump 200-3366 173-3381

    IRON CAVALRY 173‑3381 200‑3366 Heavy-Duty Hydraulic Main Pump Assembly Reliable replacement spare part designed specifically for E320C construction excavators. This heavy-duty hydraulic main pump assembly ensures optimal performance and durability in demanding construction environments. PRODUCT ...
  • OEM PC850-8 Excavator Swing Reduction Gearbox Parts 209-26-00040

    PC850-8 Excavator Swing Reduction Gearbox 209-26-00040 Swing Gearbox Parts Product Description Model:PC850-8 209-26-00040 Swing Gearbox Category:Reduction Gearbox Parts Condition: Original & OEM Warranty:6-12 Months MOQ: 1 pcs Production Capacity: 1000pcs /Month Standard or Nonstandard: Standard ...
  • PC200-8K Hydraulic Excavator Main Pump Assembly 708-2L-00700 708-2L-00701 Main Pump

    Hydraulic Pump Assembly 708-2L-00700 708-2L-00701 708-2L-41230 Excavator Main Pump for Construction Machinery Parts PRODUCT DESCRIPTION Model:708-2L-00700 Hydraulic Pump Category:Komatsu Equipment Parts Brand: IRON CAVALRY Place of Origin:China Condition: Original & OEM Warranty:6-12 months MOQ: 1 ...
  • Used Travel Motor Final Drive Assembly For PC1250-8 Excavators

    Product Description Model:PC1250-8 Final Drive Category:Final Drive Brand: IRON CAVALRY Place of Origin:China Condition: Original & OEM Warranty:6-12 months MOQ: 1 pcs Production Capacity: 500pcs /Month Standard or Nonstandard: Standard Payment Term: L/C,T/T, Western Union, Tradeassurance Delivery ...

Send An Inquiry